Date

November, 2024

Location

Boston, Massachusetts

Budget

$35,000

Client

Robert Johnson

Challenges

The client wanted to build a completely new bathroom in a previously unused space, requiring extensive construction, including plumbing, electrical work, and flooring installation.

Our Solutions

Our team managed the entire construction process, from framing to final finishes. We installed a walk-in shower, double vanity, and custom tile work, along with high-end fixtures and modern lighting. We also ensured that the design complied with local building codes and maximized the use of space. The project was completed on schedule and within budget, leaving the client with a stunning, functional bathroom.

Before & After

28ab914f-7be4-4490-8f6c-0851ba98cb4d 49d118cb-d952-40b7-bd2a-4a69d14b1355

Get Your Quote